Skip to main content

Figma Design File

  1. UX Projects/

Streamlining REC Device Registrations

GoNetZero

2024

Role

Product Designer

Responsibilities

System Design

User Interface Design

User Research

Team

Product Manager

Engineer

Research

Analytics

Table of Contents

#decarbonizationb image

1. Executive Summary
#

GoNetZero, a decarbonization firm by SembCorp, traditionally managed the registration of REC-generating devices via manual email processes. This method resulted in processing times of 3 – 4 months, increased operational liability, and high manpower costs. Our engagement focused on designing a dedicated web form and process flow integrated within Gonetzero’s platform to enable self-registration by customers. This initiative reduced processing time to 1 month, improved data governance, enhanced customer transparency, and significantly lowered manual intervention.

Key Metrics & Highlights
#

  • Processing Time Reduction: From 3 – 4 months to 1 month.
  • Operational Efficiency: Significant decrease in manhours required for registrations.
  • Risk Mitigation: Lowered liability through improved data governance.
  • Enhanced User Experience: Empowered customers with flexible, transparent registration.

#image (Key Metrics / Highlights)


2. Background & Context
#

Project Background
#

Gonetzero’s operations team was burdened by a manual, email-based registration process for REC-generating devices, interfacing with APX and IREC registries. This outdated method not only slowed operations but also introduced significant risks related to data handling and compliance.

Business & User Goals
#

  • Business Objective: Reduce operational overhead and liability by automating the registration process.
  • User Objective: Enable a self-service model that provides customers with greater flexibility and immediate insights into their registration status.

Project Scope & Constraints
#

  • Scope: Design and implement a web-based registration form and process flow.
  • Constraints: Must align with the stringent requirements of APX and IREC registries; limited historical process documentation required intensive stakeholder engagement to uncover hidden steps in the manual process.

#image (Background or Process Context)


3. Problem Definition
#

The Core Challenge
#

The manual registration process was inefficient, error-prone, and inherently risky. With processes managed through disparate emails, there was no standardized method to ensure data accuracy or timely processing, leading to operational delays and increased liability.

User Pain Points & Needs
#

  • Operational Inefficiencies: Prolonged processing times and high reliance on manual input.
  • Customer Frustrations: Lack of transparency and control over the registration journey.
  • Compliance Risks: Inconsistent data governance increasing the risk of regulatory non-compliance.

Impact on Business
#

Without an automated system, Gonetzero faced mounting operational costs and potential compliance failures, hindering scalability and competitive positioning in a fast-evolving market.

#image (User Pain Points / Problem Overview)


4. Research & Discovery
#

Methodology
#

A thorough discovery phase was initiated by identifying key stakeholders and conducting detailed interviews to map out the existing manual processes. This qualitative research was essential in understanding the intricacies and gaps inherent in the current workflow.

Key Insights & Findings
#

  • Process Bottlenecks: Critical delays identified in manual data entry and validation.
  • Regulatory Alignment: Immediate need to standardize processes to meet APX and IREC requirements.
  • User Expectations: Demand for a more transparent and flexible registration experience.

Personas & Empathy Mapping
#

By developing stakeholder personas—ranging from Gonetzero’s operations staff to end-user customers—the team pinpointed specific needs and frustrations, informing the design strategy.

#image (Personas and Empathy Mapping)

User Journey Mapping
#

The current (as-is) process was charted to reveal multiple friction points, highlighting opportunities for automation and streamlining the registration flow. This mapping laid the groundwork for the future state design.

#image (User Journey Map)


5. Ideation & Concept Development
#

Brainstorming & Concept Exploration
#

A series of workshops were conducted to explore potential solutions. Collaborative sessions focused on translating manual steps into digital interactions, with the goal of reducing redundancies and ensuring regulatory compliance.

Defining User Flows & Information Architecture
#

A reimagined user journey was developed, featuring a logical progression through registration stages—from initial data entry to final validation. The revised information architecture emphasized clarity and reduced complexity for end users.

#image (User Flow Diagram)

Wireframes & Low-Fidelity Prototypes
#

Initial sketches and low-fidelity prototypes were rapidly produced to visualize the new process flow. These early iterations provided a concrete basis for collecting stakeholder feedback and refining the interface before moving into high-fidelity design.

#image (Low-Fidelity Prototype)


6. Design Process & Iterations
#

High-Fidelity Visual Design
#

The design evolved into a polished, high-fidelity prototype reflecting Gonetzero’s brand identity. Visual elements were carefully chosen to balance aesthetic appeal with user functionality, ensuring that each step in the registration process was intuitive.

#image (High-Fidelity Prototype)

Interaction & Micro-Interactions
#

Key micro-interactions—such as real-time form validation, progress indicators, and contextual tooltips—were integrated to enhance usability and reduce the likelihood of user error. These elements were pivotal in streamlining data entry and validation.

Prototyping & Usability Testing
#

Multiple rounds of usability testing were conducted with both internal and external stakeholders. Feedback from these sessions was systematically incorporated, resulting in iterative refinements that improved the overall user experience and ensured compliance with registry standards.

Design Rationale & Decision Making
#

Each design decision was grounded in the dual objectives of operational efficiency and regulatory compliance. The iterative testing process provided the data needed to make informed adjustments, ensuring the final design addressed both user needs and business goals.

#image (Usability Testing Results)


7. Implementation & Collaboration
#

Developer Handoff
#

A comprehensive design handoff package was prepared, including annotated high-fidelity prototypes, detailed process flows, and supporting documentation. This package ensured a seamless transition to development, with clear guidelines for technical implementation.

Cross-Functional Collaboration
#

Close coordination was maintained with developers, product managers, and regulatory compliance experts throughout the project. Regular update sessions and collaborative workshops ensured that the design was technically feasible and aligned with all stakeholder requirements.

#image (Team Collaboration)

Technical Considerations & Accessibility
#

Technical feasibility studies and accessibility audits were integral to the process, ensuring the solution was robust, scalable, and compliant with modern standards. Responsive design principles were applied to guarantee optimal performance across devices.


8. Results & Impact
#

Final Outcome Showcase
#

The final solution is an intuitive, web-based registration platform that empowers customers to self-register their REC-generating devices. The new system streamlines the entire process, from data input to validation, significantly reducing processing times.

#image (Final Product Showcase)

Metrics & Qualitative Feedback
#

  • Processing Time: Reduced from 3–4 months to 1 month.
  • Operational Efficiency: Marked decrease in manual intervention and associated manhours.
  • User Experience: Customers report enhanced transparency and ease of use.
  • Compliance & Data Governance: Improved data quality and adherence to APX/IREC standards.

Before & After Comparisons
#

Visual and quantitative comparisons clearly illustrate the transformative impact of the automated process, showcasing reduced delays, lower error rates, and improved stakeholder satisfaction.

#image (Before and After Comparison)


9. Reflections & Future Directions
#

Lessons Learned
#

  • Stakeholder Engagement: In-depth interviews and process mapping were essential for uncovering hidden inefficiencies.
  • Iterative Design: Continuous prototyping and testing allowed for real-time validation and refinements.
  • Compliance Alignment: Early and ongoing consultation with regulatory teams was key to maintaining data integrity.

Opportunities for Future Improvements
#

  • Advanced Analytics: Integrating real-time analytics to monitor registration progress and identify bottlenecks.
  • Predictive Automation: Exploring AI-driven solutions to preemptively flag data discrepancies and streamline validation.
  • Expanded Self-Service: Scaling the self-registration model to accommodate additional processes within Gonetzero’s operational ecosystem.

Personal Takeaways
#

This project underscores the transformative potential of digital automation in complex regulatory environments. The collaborative approach and rigorous iterative process not only met immediate operational needs but also set a precedent for future innovations.


10. Appendix (Optional)
#

Additional Assets & Process Work
#

  • Detailed process maps
  • Interview summaries and stakeholder personas
  • Iterative design prototypes and usability test reports

#image (Appendix Assets)

Acknowledgments & Collaborators
#

Gratitude is extended to the Gonetzero operations team, compliance experts, and all stakeholders who contributed their insights and expertise throughout this engagement.


Final Thoughts
#

The Gonetzero REC Device Registration project represents a significant leap forward in operational efficiency and user experience. By transforming a labor-intensive, error-prone process into a streamlined, self-service platform, Gonetzero has not only reduced registration times and operational costs but also set new standards in data governance and regulatory compliance. This case study exemplifies the strategic value of digital transformation in delivering measurable business outcomes.